← All Services

Bushfire (BAL) Home Design

Homes for bushfire-prone land, designed around the Bushfire Attack Level from the first sketch rather than adjusted to it at the end. We coordinate the bushfire assessment, resolve the design and take it through DA or CDC approval to construction documentation.

Book a free consultation Call Jay 0410 752 616
Abbott Road Heathcote family home concept designed by Francis Design
What's included

The BAL rating, designed in from the start.

  • Bushfire-Prone Land Check
  • Bushfire Consultant Coordination
  • Siting & Layout for the BAL
  • Materials & Glazing Selection
  • DA or CDC Pathway Advice
  • BASIX Certificate (via external consultant)
  • Construction Documentation
  • Builder Introductions

Designing on bushfire-prone land

Councils map bushfire-prone land, and new homes, rebuilds and extensions on it are assessed against Planning for Bush Fire Protection 2019, the NSW Rural Fire Service standard. The assessment gives the site a Bushfire Attack Level, or BAL, and that rating sets the construction standard the home must meet under AS 3959.

The BAL affects materials, glazing and cost, which is why it belongs at the start of the design rather than the end. Many streets in the Sutherland Shire near the Royal and Heathcote National Parks are bushfire prone, and it is one of the site constraints we read before any design work.

The six Bushfire Attack Levels

The RFS sets out six levels, from lowest to highest exposure. The higher the level, the more demanding the construction requirements.

What it means for approval
BAL-LOWComplying development possible with a BAL certificate
BAL-12.5Complying development possible with a BAL certificate
BAL-19Complying development possible with a BAL certificate
BAL-29Complying development possible with a BAL certificate
BAL-40Development Application required
BAL-FZ (Flame Zone)Development Application required

For complying development, a BAL certificate must be endorsed by an accredited bushfire consultant or the council. For a DA, a bushfire assessment report determines the BAL. Sites rated BAL-40 or Flame Zone cannot use complying development at all.

How design affects the outcome

The BAL is worked out from the vegetation around the site, its distance from the building and the slope of the land. That means some of the outcome depends on the design itself.

  • Siting: where the block allows, placing the home further from the hazard vegetation can lower the rating, which can change both the approval pathway and the construction cost.
  • Materials and glazing: chosen to suit the rating from the start, so the design does not have to be reworked once the assessment comes back.
  • Sloping sites: levels, decks and the underfloor resolved together, as steep blocks in places like Como, Grays Point and Bundeena often need.

We coordinate the bushfire consultant alongside the surveyor, engineer and BASIX consultant, and carry the BAL requirements through to the construction documentation so your builder prices the right specification. Bushfire reports are prepared and billed separately by the consultant.

New homes, rebuilds and extensions

The same thinking applies whether you are designing a new custom home, replacing an existing house through a knockdown rebuild, or adding to one with renovations and extensions. On a rebuild, the new home is assessed under the current standard, which may differ from the rules the old house was built under.

Our Wildmere dual occupancy at Yatte Yattah takes a different kind of cue from fire: its black rooflines and pebbles reference the land's bushfire history, and the homes are sunken into the hillside for shelter.

Closer to home, the Oyster Bay Bushland Residence is a BAL-FZ (Flame Zone) new home on a sloping bushland block in the Sutherland Shire. Non-combustible metal cladding, off-form concrete and bushfire shutters hidden in pelmets carry the fire protection, and the project is now at DA stage.

Approval pathway

Depending on the BAL and the site, the project goes through a CDC with a private certifier or a DA with council. We identify the pathway early, prepare and lodge the application, and deal with council or the certifier through to determination. See council approvals and compliance.

Fees

Bushfire-prone sites need additional expertise, which is reflected in the fee. Every project is quoted after an initial consultation and site review, and bushfire, engineering and council fees are separate. See how our design fees are structured.

How we deliver

From bushfire check to builder handover.

01

Consultation & Brief

Your site, your plans for it and your budget, with an early check of whether the land is mapped bushfire prone.

02

Site Review & Bushfire Assessment

Vegetation, slope, access and council controls, with the bushfire consultant engaged early so the BAL informs the design.

03

Concept Design & 3D Direction

Siting, form and materials shaped around the BAL, paired with 3D visualisation and tested against your budget.

04

DA or CDC Approval

Application documentation with the bushfire report or BAL certificate, BASIX through an external accredited consultant, and liaison through to determination.

05

Construction Documentation & Handover

Drawings and specifications that carry the BAL construction requirements, so your builder prices the right standard.

FAQs

Bushfire design questions.

What is a BAL rating? +

BAL stands for Bushfire Attack Level. It measures a building's potential exposure to ember attack, radiant heat and flame, and sets the construction standard under AS 3959. There are six levels: BAL-LOW, BAL-12.5, BAL-19, BAL-29, BAL-40 and BAL-FZ (Flame Zone).

How do I know if my land is bushfire prone? +

Councils map bushfire-prone land. We check whether your property is affected at the start of every project, before any design work.

Can I get a CDC on bushfire-prone land? +

Sometimes. Complying development is possible up to BAL-29 with a BAL certificate endorsed by an accredited bushfire consultant or the council. Sites rated BAL-40 or Flame Zone need a Development Application.

Who prepares the bushfire report? +

A qualified bushfire consultant. We engage and coordinate the consultant as part of the design process, and their report is billed separately.

Can design lower the BAL rating? +

The rating comes from the vegetation, its distance from the building and the slope of the land. Where the block allows, siting the home further from the hazard vegetation can lower it. We test this during concept design.

Does a bushfire rating affect the cost of building? +

Yes. Higher ratings bring more demanding requirements for materials, glazing and construction details. Designing for the rating from the start avoids redesign and helps your builder price accurately.

Are you a bushfire consultant? +

No. Francis Design is a building designer. A qualified bushfire consultant assesses the BAL, and we design the home to suit it and coordinate the report through approval.

Related concepts

Plain-English definitions in our building design glossary.

Next Step

Building on bushfire-prone land?

Book a free consultation with Francis Design and find out how the BAL affects your design, which approval pathway applies, and what your site can carry.

Free Consultation

Send a quick enquiry

Share a little about your project and Jay will come back with a tailored next step.

Call Now Book Consult