Subdivision house design.
Plan the homes, access, services and future lot boundaries together so the subdivision works on paper and on the ground.
Subdivision is not simply a line drawn between two houses. Lot dimensions, access, parking, private open space, services, drainage and the relationship between dwellings all need to work before a subdivision pattern is worth pursuing.
Francis Design begins with site feasibility: zoning, minimum lot requirements, frontage, easements, constraints and the development type the controls permit. We then test a building arrangement that gives each proposed lot a functional home, clear address and usable outdoor space.
The subdivision pathway is coordinated with the building approval, surveyor and relevant consultants. Depending on the project, subdivision may occur through Torrens title, strata or community title, and the timing can affect both documentation and construction.
For two homes on one Wollongong lot, our dual occupancy guide for Wollongong explains the R2 lot tests, and the duplex design guide compares Torrens and strata subdivision.
What the subdivision concept needs to resolve
A viable layout balances development yield with homes people can live in comfortably.
- Lot width and area after the proposed boundary is applied
- Driveways and access, including shared access where appropriate
- Services and easements for water, sewer, stormwater, power and communications
- Orientation and privacy between the proposed homes
- Parking, landscaping and private open space for each dwelling
From feasibility to approval
We coordinate the building design with the registered surveyor, planner, civil or stormwater engineer and other specialists the site requires. For two homes on one lot, see duplex and dual occupancy design; for larger outcomes, see townhouse and multi-dwelling design.
A considered scope with no surprises.
- Planning and minimum-lot review
- Yield and building-envelope testing
- Proposed lot and access planning
- Dwelling concept design
- Surveyor and consultant coordination
- Stormwater, services and easement planning
- DA or CDC pathway advice
- Construction and subdivision documentation coordination
Common questions.
Can I subdivide my property? +
It depends on zoning, minimum lot size and width, access, services, constraints and the development proposed. A feasibility study is the right first step.
Should the houses or subdivision be designed first? +
They should be tested together. A boundary that looks efficient can leave one or both homes with poor access, orientation, parking or outdoor space.
What is the difference between Torrens and strata subdivision? +
Torrens title generally creates separate parcels of land, while strata separates ownership of lots within a development and can include common property. A registered surveyor and solicitor advise on the most suitable title structure.
Do you prepare subdivision plans? +
We design the development and coordinate the approval documentation. The formal subdivision plan is prepared and certified by a registered surveyor.
Can a duplex be subdivided? +
Sometimes. The available title arrangement and timing depend on the planning pathway, servicing and local requirements, so subdivision should be considered from the beginning.
Plain-English definitions in our building design glossary.
