Building on a sloping block in Wollongong.
Steep Illawarra blocks often have the best views and the hardest site works. Here is how a building designer turns the slope from a cost problem into the shape of the house.
By Jay Francis, building designer and director of Francis Design. Updated 25 October 2026.
Much of Wollongong is built on the lower slopes of the Illawarra Escarpment, from Stanwell Park and Coledale in the north through Bulli, Mount Ousley, Mount Keira and Figtree to the hills behind Dapto. These sites often have ocean or escarpment views and good breezes, but they also raise geotechnical, drainage, bushfire and access questions that a flat block in a new estate never does.
The way to manage a sloping block is to let the land shape the design instead of forcing a flat-site plan onto it. That decision is made in the first weeks of the project, and it sets most of the cost.
Start with the land: survey, geotechnical report and site classification
Every sloping-block project begins with two documents. A detail and level survey records contours, trees, boundaries, neighbouring floor levels and services, and it is the base for every drawing. A geotechnical investigation tests the soil and rock and sets the site classification under AS 2870, from Class A for stable rock and sand to Class P for problem sites, which tells the structural engineer what footings the house needs.
On land identified for slope instability, Wollongong City Council also requires geotechnical assessment under Chapter E12 of the Wollongong DCP 2009, Geotechnical Assessment of Slope Instability. The escarpment's layered geology, with sandstone over shale and the coal measures beneath, and the history of landslip in the northern suburbs, are why council takes it seriously. Find out early whether your lot is affected; it changes what can be built and in what order.
Cut and fill, split level or suspended floor: choosing the design response
- Cut and fill with a slab: the site is benched flat and retained. It suits gentle slopes; on steep ones, the excavation, retaining and spoil removal quickly cost more than the slab saves.
- Split-level: floors step down the slope in half levels, so each part of the house sits close to the ground. It keeps living areas connected to the garden and is a common answer on Wollongong blocks.
- Suspended floor or pole home: a lightweight frame on piers or columns sits above the slope with minimal excavation. It suits very steep or unstable sites and keeps natural drainage paths open.
- Garage below: on blocks rising from the street, the garage tucks into the slope and the living level sits above it with the view.
Most of our sloping-block designs combine two of these. Our split-level house design and sloping block house design pages show how each works.
Stormwater, retaining walls and access on steep Illawarra sites
Water is the issue most often underestimated. On a block that rises from the street, stormwater can usually drain to the kerb. On a block that falls away from the street it cannot, and the design needs a drainage easement through a downhill neighbour or an engineered on-site solution, which council will expect to see resolved at approval. Heavy escarpment rainfall makes this far more than a paperwork exercise.
Retaining walls, excavation and machinery access come next. A narrow, steep driveway can limit the size of excavator and how concrete and frames are delivered, which adds time and cost to construction. Designing for buildability, with fewer and lower retaining walls and a footprint that follows the contours, is the most effective cost control on a slope.
Bushfire, views and council controls on escarpment land
Many escarpment-edge lots are mapped as bushfire-prone. A bushfire assessment under Planning for Bush Fire Protection 2019 sets a Bushfire Attack Level (BAL) under AS 3959, from BAL-LOW to BAL-FZ, and the rating drives cladding, glazing, decking and gutters, and sometimes the approval pathway: the higher ratings generally rule out a CDC. Our bushfire BAL home design page covers the detail.
Height limits are measured from existing ground level, so on a slope the allowable building envelope tilts with the land. That affects how many levels a design can fit and where the view rooms sit, and it is also why neighbours' views and privacy feature in so many Wollongong hillside assessments.
What a sloping block adds to build cost
We don't quote build prices; your builder does that from the documents. The extra cost of a slope comes from predictable items:
- Engineered footings, piers or screw piles
- Excavation and spoil removal
- Retaining walls and their drainage
- Stormwater easements or on-site systems
- Restricted access, cranes or smaller machinery
- Extra stairs, balustrades and structure for split levels
- Bushfire construction requirements
A geotechnical report and a concept that follows the contours are the two cheapest ways to bring those numbers down before the builder prices the job. If an existing house is coming down first, our knockdown rebuild guide covers the demolition stage.
Choosing a builder for a steep or escarpment block
Not every builder takes on steep sites. Many volume builders price for flat lots and standard slabs, and a sloping block can push their price well past the base design. A custom builder with slope experience reviews the geotechnical report, the engineering and the access before quoting, and prices the site works properly instead of leaving them as provisional sums.
When you shortlist, look for builders experienced with steep escarpment blocks who can show split-level, stepped or suspended homes they have completed in the Illawarra, explain how they will get machinery and materials onto the site, and walk you through their approach to retaining and drainage. Owners and builders can also engage us directly to design and document the home; see our Wollongong house design page.
Common questions.
Do I need a geotechnical report for a sloping block in Wollongong? +
Almost always. Footing design needs the AS 2870 site classification, and land identified for slope instability needs geotechnical assessment under Chapter E12 of the Wollongong DCP before council will approve the development.
Is it more expensive to build on a sloping block? +
Usually, because of footings, excavation, retaining, drainage and access. A design that follows the contours, rather than benching the whole site flat, keeps the extra cost down.
What is the best house design for a steep block? +
There is no single answer. Split-level designs suit moderate slopes, suspended floors or pole homes suit steep or unstable sites, and a garage below the living level suits blocks rising from the street. The geotechnical report and survey decide which works.
What happens with stormwater if my block slopes away from the street? +
Water cannot drain to the kerb by gravity, so you usually need a drainage easement through a downhill property or an engineered on-site system. Council will want the solution shown at approval stage.
Can I get a CDC on a sloping block? +
Sometimes. Complying development limits excavation, fill and retaining, and the higher bushfire ratings exclude it, so many steep Wollongong sites go through a development application.
Can a sloping block take a duplex? +
Yes, if the zone and lot allow dual occupancy. Each home needs its own levels, access and drainage, so the design has to resolve the slope for both dwellings.
Plain-English definitions in our building design glossary.