What does it cost to design a house?
How our design fees are structured, what each stage includes, and the consultant and council costs that sit outside the design fee, so you can compare quotes on the same basis.
The cost of designing a house depends mostly on the level of service you need: drawings of a design you have already decided, a full building design taken through council approval, or an architect’s full service including contract administration. The design fee is also only one part of the pre-construction budget. Engineering, surveys, reports and council or certifier fees are paid separately.
Below is how our fees are structured, what each stage covers, which costs sit outside the design fee, and what pushes a fee up or down, so you can compare quotes on the same basis.
How design fees are charged
- Fixed fee per stage: a set fee for each stage of a defined scope. This is how we quote new homes, renovations and duplexes, so you know the cost of each stage before approving it.
- Hourly rate: suits small or open-ended work, such as minor amendments or advice on an existing set of plans.
- Percentage of construction cost: common in full architectural services. The fee rises with the construction budget, so it is only final once the building cost is known.
What the design fee covers
- Schematic design: site and planning analysis, the brief, and initial concepts developed around your vision.
- Design development: refinement of the plan, elevations, materials and systems, with 3D views where they help decisions.
- Construction documentation: the DA or CDC drawings and the detailed set a builder prices and builds from.
Each stage requires your approval before we proceed to the next. We also prepare and lodge the council approval application and coordinate the consultants it needs.
Costs outside the design fee
Whoever designs your home, most projects also need some of the following. They are quoted by each consultant or authority, and we coordinate the consultants’ work into the design:
- Detail and contour survey of the site
- Structural engineering for footings, slab and framing
- BASIX certificate and, where needed, a thermal assessment (BASIX and sustainable design)
- Geotechnical report on soil and rock
- Stormwater or hydraulic design
- Site-specific reports: bushfire (BAL), flood, arborist or heritage, depending on the site
- Council DA fees or certifier fees, including construction certificate fees
- NSW Long Service Levy: 0.25% of the cost of building work, for work costing $250,000 or more
What influences the fee
- Size and number of storeys: more floor area and levels mean more design and documentation.
- Site complexity: steep, bushfire-prone, flood-affected and heritage-listed sites require additional expertise.
- Renovations and alterations: existing structures require measuring, detailed modelling and integration.
- Approval pathway: a CDC is usually simpler to document than a DA that needs detailed planning justification.
- Design approach: solar passive or health-focused design influences scope.
- Materials and finishes: high-end finishes, custom joinery and unique materials require additional design and documentation time.
- Changes after approval: significant changes to an approved stage add time and fees.
Putting the fee in context
Most of the homes we design have a construction value of $500,000 to over $1,000,000, depending on scale and finishes. At that level, decisions made during design, such as the footprint, structure, site works and specification, affect the build cost far more than the difference between two design quotes. A complete, well-coordinated documentation set also lets builders price accurately, which reduces variations once construction starts.
Comparing us with an architect or a drafting service? See architect vs building designer vs draftsperson.
Fee proposals and agreements
After an initial consultation and a review of your brief, we provide a written scope of works with a fee for each stage. Once that is agreed and signed, design work commences.
Significant changes or variations after a stage has been approved may incur additional fees, based on the extent of the modification and the time required to implement it.
Meetings and consultations
Online meetings are preferred for efficiency. In-person consultations are available, with a possible travel fee depending on location and frequency.
Additional services
- Builder selection: assistance choosing a builder suited to your requirements and budget.
- Contract administration: oversight ensuring construction follows the design and specification.
- 3D visualisation: photorealistic renders of the design.
- Interior design: finishes, joinery and fixture selections.
Common questions
How much does it cost to design a house in Sydney?
It depends on the size of the home, the site and how much of the process you need covered. We quote a fixed fee for each stage after an initial consultation, so you know the cost before work begins. Consultant reports and council or certifier fees are additional.
Does the design fee include council approval?
Our scope includes preparing and lodging the DA or CDC application and dealing with council or the certifier. The application fees themselves, and the consultant reports the application needs, are paid separately.
Is it cheaper to buy a ready-made house plan?
The plan itself is cheaper, but it still has to be adapted to your block, checked against council controls and documented for approval and construction, and it will not respond to your site’s orientation or outlook. For a custom home, that adaptation work can approach the cost of designing it properly.
Do you charge for the first consultation?
No. The initial consultation is free, and it is where we work out the scope we would quote on.